Case studies
Case study 1: Planning to restore service in hours, not days, for a 150-person firm
I led this work in a previous role at a UK professional services firm. This was the more recent of the two examples. Figures are approximate and based on memory.
The result.
A full recovery test showed it took about five days to restore all services. I designed a new setup expected to bring that down to no more than two or three hours. We estimated that an outage could cost tens of thousands of pounds a day, based on staff time. Installation had begun when I moved on, so the faster recovery was an expectation—not a result tested at the time.
The challenge.
About 150 people relied on the company’s main systems. Although copies were kept on backup equipment, a full recovery test showed it still took around five days to get everything working because staff had to set things up by hand. Having a backup copy alone wasn’t enough; the company needed a faster, simpler way to get back to work.
The approach.
Moved the main business systems to a specialist data centre—a facility with more reliable power and internet than the firm’s office.
At first, kept old office equipment ready to take over if the main systems failed. Later, added lower-cost backup equipment at a second site, reusing storage the firm already owned.
Later, moved the main systems back to the office and ran them on two upgraded servers. Earlier equipment was reused as backup at another office, and other usable equipment was repurposed for testing.
Added backup power and high-speed internet at head office, plus backup connections between offices. With most staff based there, access improved and the team no longer needed to travel to the specialist facility to maintain equipment.
Started installing a separate backup system that kept frequent copies of the main systems. Keeping it separate from day-to-day equipment was intended to reduce the chance that one incident could affect both. It was placed at the second office for easy access and management.
Designed a simple, one-step recovery process that any staff member could start quickly if the main systems failed.
Built the investment case by estimating what an outage could cost the firm.
The outcome.
If the main equipment failed, staff could switch to a separate copy and keep working while the original was repaired.
The new setup was expected to restore service in under three hours, compared with around five days in the full recovery test.
The recovery process was designed so it didn’t rely on one person knowing how to do everything.
Maintenance became easier and connections between offices improved because the main equipment was located where most employees worked.
The Kerrington perspective.
The ability to keep working through an outage is a business decision, not just a technology purchase. Estimate the cost of downtime, make recovery simple enough for staff to use and place equipment where it gives the business the best value—including bringing it in-house when that makes sense.
Case study 2: Replacing 12 servers with a more reliable system
Led by me in a previous role at a UK professional services firm, around a decade ago. Figures are approximate and from memory.
The result.
For around £100,000, 12 ageing servers were replaced with one compact system designed to keep the company’s services running if one part failed. The price included software licences. It supported around 150 employees. We estimated a major outage could cost tens of thousands of pounds a day, based on staff time.
The challenge.
The business relied on 12 separate machines to run staff systems, store files and manage user accounts. It had very little backup capacity: the spare equipment could keep only a small number of employees working, so a major failure could stop work for days. A like-for-like replacement was quoted at around £120,000, but it would replace the equipment without reducing the risk.
The approach.
I started with the business need: keep employees working if equipment failed. We compared proposals from Dell EMC and Nutanix for reliability, ease of support and overall cost. Dell EMC included the required software licences, making it the stronger overall offer. The new system was installed in a specialist data centre, a facility with dependable power and internet. Existing equipment was kept as backup rather than discarded, until lower-cost equipment was added at a second site (see case study 1).
The outcome.
Replaced 12 separate servers with one compact system.
If one part failed, the system could restart affected services on the remaining equipment instead of waiting for a rebuild.
Less equipment to power, cool and maintain. A later estimate—not based on a meter reading—suggested annual electricity savings of tens of thousands of kilowatt-hours, the units shown on electricity bills.
Reused existing equipment as backup, improving the company’s ability to keep working without extra spending on new backup equipment.
The Kerrington perspective.
Good IT decisions start with what the business cannot afford to lose, then balance reliability, risk and cost. Challenging the like-for-like replacement produced a more reliable system than simply replacing the old equipment with the same kind.
